CCNP SWITCH - Implementing Cisco IP Switched Networks
Total Number of hours: 36 hrs.
Pre-requisite : Valid CCNA certification or any CCIE Certification can act as a pre-requisite.
Program Description: This course teaches students how to implement, monitor, and maintain switching in converged enterprise campus networks. Students will learn how to plan, configure, and verify the implementation of complex enterprise switching solutions. The course also covers the secure integration of VLANs, WLANs, voice, and video into campus networks. Comprehensive labs emphasize hands-on learning and practice to reinforce configuration skills.
Certification: Exam 642-813: SWITCH - Implementing Cisco IP Switched Networks
COURSE OUTLINE
- Implement VLAN based solution, given a network design and a set of requirements
- Determine network resources needed for implementing a VLAN based solution on a network
- Create a VLAN based implementation plan
- Create a VLAN based verification plan
- Configure switch-to-switch connectivity for the VLAN based solution
- Configure loop prevention for the VLAN based solution
- Configure Access Ports for the VLAN based solution
- Verify the VLAN based solution was implemented properly using show and debug commands
- Document results of VLAN implementation and verification
- Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
- Determine network resources needed for implementing a Security solution
- Create a implementation plan for the Security solution
- Create a verification plan for the Security solution
- Configure port security features
- Configure general switch security features
- Configure private VLANs Configure VACL and PACL
- Verify the Security based solution was implemented properly using show and debug commands
- Document results of Security implementation and verification
- Implement Switch based Layer 3 services, given a network design and a set of requirements
- Determine network resources needed for implementing a Switch based Layer 3 solution
- Create an implementation plan for the Switch based Layer 3 solution
- Create a verification plan for the Switch based Layer 3 solution
- Configure routing interfaces Configure Layer 3 Security
- Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
- Document results of Switch based Layer 3 implementation and verification
- Prepare infrastructure to support advanced services
- Implement a Wireless Extension of a Layer 2 solution
- Implement a VoIP support solution
- Implement video support solution
- Implement High Availability, given a network design and a set of requirements
- Determine network resources needed for implementing High Availability on a network
- Create a High Availability implementation plan
- Create a High Availability verification plan
- Implement first hop redundancy protocols
- Implement switch supervisor redundancy
- Verify High Availability solution was implemented properly using show and debug commands
- Document results of High Availability implementation and verification